The Village Mission Valley Pool Facilities Renovation

San Diego, CA

 

PACE provided aquatic consulting services for six different bodies of water for an existing apartment community for The Irvine Company including a new 4,700 square foot lap pool including new construction, an existing 4,800 square foot small pool, an existing 1,500 square foot big pool, and three (3) existing spas, each between 71-75 square feet, with each being a skimmer style with plaster finish. The features of each pool renovation are as follows:

 

New lap pool

  • Skimmer pool, plaster finish
  • Area: 4,700 SF; Volume: 177,000 GAL
  • Scope: new pool construction Existing small pool
  • Skimmer pool, plaster finish
  • Area: 4,800 SF; Volume: 137,000 GAL
  • Scope: replaced coping, depth marker, handrails, and grabrails; re-located pool step inserts, replaced pool lights; and re-plastered.

 

Existing big pool

  • Skimmer pool, plaster finish
  • Area: 1,500 SF; Volume: 44,000 GAL
  • Scope: replaced coping, depth markers, handrails, and grabrails; relocated pool step inserts, replaced pool lights; and re-plastered.

 

Existing spas

  • Skimmer spa, plaster finish
  • Right Spa: Area: 71 SF; Volume: 1,600 GAL
  • Middle Spa: Area: 75 SF; Volume: 1,700 GAL
  • Left Spa: Area: 71 SF; Volume: 1,600 GAL
  • Scope: replaced coping, depth marker, handrails, and pool lights; and re-plastered.

 

Key Features:

  • Renovated pools shape
  • Developed plan to re-plaster
  • Replaced coping, depth marker, waterline tiles, handrails, grab rails, pools/spas lights, etc.
Client

Burton Landscape Architecture Studio

Categories
Lake Systems / Water Features / Pools, Pools / Spas / Swim Lagoons