City of Douglas staff unveiled a new solar array site at the Waste Water Treatment Plant
The new solar array is a 300 kW DC system, and was produced in part by Michael Krebs, PE, Vice President of PACE Advanced Water Engineering.
Krebs noted that before prior to the solar project’s completion, Arizona Public Service (APS) cost rates for the Waste Water Treatment Plant were projected to rise from $130,000 to $200,000 annually by 2035. Read more…
