Duong Do and Cherise Thompson Present on the Via Princessa Regional Park and BMP Project at This Year’s CASQA Conference

Duong Do and Cherise Thompson Present on the Via Princessa Regional Park and BMP Project at This Year’s CASQA Conference

PACE was selected to present on the Via Princessa Regional Park and BMP Project led by Duong Do and Cherise Thompson. This project included streambank stabilization improvements along approximately 500 LF of the west bank of Honby Creek and approximately 1,500 LF along the south bank of the Santa Clara River.

Hydraulic analysis was performed to determine design guidelines for the proposed bank protection measures and to evaluate potential changes to water surface elevations or extents of flooding caused by the Via Princessa Park and the proposed bank stabilization, which are summarized in a Drainage Concept Report prepared by PACE.