Integrated Water Management
Integrated Water Management

Integrated Water Management

  • Multi-use systems
  • Regional solutions
  • Generating public value
  • Water, wastewater and stormwater management plans
Water Science Research
Water Science Research

Water Science Research

  • Treatment technology development
  • Bench, pilot and field testing
  • In-house water quality modeling and testing
  • In-house pilot-scale modeling
  • Emerging contaminant research
  • Industrial water reuse
Progressive Watershed Management
Progressive Watershed Management

Progressive Watershed Management

  • Research-driven
  • Physical modeling
  • Sophisticated GIS capabilities
  • Dynamic water quality modeling
  • Complex fluvial systems
  • Holistic understanding of natural watershed processes
Innovative Water Treatment
Innovative Water Treatment

Innovative Water Treatment

  • Natural treatment
  • Challenging water constituents
  • High recovery rate
  • Low energy usage
  • Development of untapped sources
  • Contaminated water recovery
Creative Water Systems
Creative Water Systems

Creative Water Systems

  • Integrated flood, water quality, recreational water systems
  • Naturalized stormwater management
  • Wildlife habitat enhancement
  • Unique recreational water systems
  • Value-added water infrastructure
Natural Resource Protection
Natural Resource Protection

Natural Resource Protection

  • Minimize net usage
  • Groundwater recharge
  • Stormwater / runoff capture
  • Hydromodification
  • Creative water use management
Back

About Us

PACE is a civil engineering firm offering advanced water resource services by applying knowledge, creativity and innovative design approaches to develop aesthetic, environmentally sustainable and practical engineering solutions.

Service Areas Include:

  • Stormwater management / flood control
  • Water and wastewater
  • GIS water resource applications
  • Lake systems / water features / pools

California and Federal SBE
PACE is a proud sponsor of ULI Orange County / Inland Empire, BIA OC, and BDA OC.

Magic Johnson Park

The Los Angeles County Board of Supervisors approved the funding of the first phase of construction for the Magic Johnson Park, located in Willowbrook, CA. PACE is designing a new unique stormwater system for this park that will capture urban runoff (dry and wet weather first-flush flows), treat the captured flows, recycle the water for onsite irrigation, and store the treated recycled water within the park’s newly renovated lake.

Read More …

Upcoming Conferences

2018 CASQA Annual Conference

Connecting the Drops from Summit to Sea
Oct 15-17 | Riverside Convention Center – Riverside, CA

We will be exhibiting at booth #12.